About our condo, commercial and repairs service
Condo renovations come with building rules: approved work hours, elevator bookings and board approval for some changes. We plan around those rules and protect common areas. Our kitchen and bathroom teams do most condo work.
For businesses, we build out offices, retail units and restaurants. We also take on handyman jobs, emergency repairs after leaks or storms, and seasonal maintenance for owners and landlords.
What's included
What we do
- Condo renovations
- Commercial renovations (offices, retail, restaurants)
- Handyman and small repairs
- Emergency repairs
- Seasonal maintenance and snow removal
How your project runs
Site visit
We look at the space, talk through your goals and check zoning and permit needs.
Drawings and estimate
You get a written, itemized estimate and a schedule. We prepare drawings and permits.
Build
One project manager runs the trades and keeps you updated each week.
Inspect and hand over
We book every inspection and walk you through the finished work.
Condo renovations, commercial fit-outs and repairs we take on
This service covers three kinds of work that share one thing: someone besides you has rules about how the work is done. In a condo it is the board and property manager. In a commercial unit it is the landlord, the city and often a franchise or insurer. For small and emergency repairs, it is usually time and access.
- Condo suites: kitchens, bathrooms, flooring, lighting, built-ins, opening up walls and full suite renovations in buildings across Hamilton, Stoney Creek, Brampton, Kitchener and Cambridge.
- Townhouse and low-rise condos: interior work plus exterior items the corporation approves, such as fences, gates, decks and patios.
- Commercial interiors: offices, retail stores, clinics, salons and restaurants, from new tenant fit-outs to refreshes of an existing space.
- Repairs and maintenance: drywall, doors, trim, small plumbing and electrical fixes, water damage repairs and seasonal work for owners and landlords.
Our condo kitchens and bathrooms use the same crews and methods as our kitchen renovations and bathroom renovations, with extra planning for building rules.
Condo renovation approvals: board rules and section 98 agreements
Before any work in a condo, find out what belongs to your unit and what is common element. The condo's declaration and its unit boundary description decide this, and they differ from building to building. In many buildings, the concrete slabs, exterior walls, windows, balcony, main plumbing risers and fire safety systems are common elements, while finishes, cabinets and fixtures inside the suite belong to the unit.
Work inside your unit
Most condos have an alteration or renovation request form. The property manager typically asks for a scope of work, drawings or a floor plan, product data (especially for flooring underlay), the contractor's liability insurance certificate naming the corporation, a WSIB clearance, and a schedule. Approval commonly takes 2 to 6 weeks, longer if the board meets monthly or wants an engineer to review the plans.
Changes to common elements
Changing a common element, such as adding a door through a demising wall, coring the slab for a drain, or altering a balcony or patio, falls under section 98 of Ontario's Condominium Act, 1998. The board must approve it by resolution, and the owner and the corporation sign a written agreement, usually called a section 98 agreement. That agreement sets out who pays for the work and who is responsible for repairing, maintaining and insuring the alteration, and it is registered on title to your unit.
The board has broad discretion to refuse a request, though it must act reasonably. The owner usually pays the corporation's costs to prepare and register the agreement, and for any engineering review. Larger alterations can also require notice to, or approval from, the other owners. Starting work before approval risks an order to remove it and restore the original condition at your cost.
Tip: Ask the property manager for the renovation package before you finalize a design. Knowing the flooring rules, work hours and approval steps early prevents redesigns later.
Working in a condo building: hours, elevators and protection
Condo renovations run on the building's schedule. Most buildings allow noisy work only on weekdays during set hours, often around 9 a.m. to 5 p.m., with quieter work sometimes allowed until early evening. Weekends and holidays are usually off-limits. We plan noisy tasks such as demolition, coring and tile cutting into the allowed windows so the job keeps moving.
- Elevator bookings: deliveries and debris go only in the service elevator, with pads installed, at booked times. Cabinets, countertops and bathtubs are measured against the elevator cab and the suite door before ordering.
- Deposits: many buildings take a refundable damage or elevator deposit, and some charge a move or booking fee.
- Protection: we cover corridor floors from the elevator to the suite, use dust barriers and sticky mats at the door, and clean common areas daily.
- Debris: renovation waste leaves the building in bins or bags with our crew. It never goes down the garbage chute.
- Parking and access: visitor parking for trades is often limited, so we arrange loading-dock times and parking with the concierge or superintendent in advance.
We keep a copy of the approval letter and building rules on site, and we keep the property manager informed of the schedule, which helps protect your relationship with the board and your neighbours.
Condo flooring, plumbing, electrical and fire safety limits
Condo construction limits what you can change. Knowing the limits early keeps your design realistic.
- Flooring: most buildings require an acoustic underlay that meets a minimum sound rating set in the building rules, to limit impact noise to the unit below. Hardwood, engineered wood, laminate and luxury vinyl plank can all work with the right underlay. We submit the product sheet with your request.
- Plumbing: drains run through the slab or into shared stacks, so moving a toilet or shower more than a short distance may need slab coring, which requires board approval and often a structural engineer's scan. Shutting off a riser usually needs building staff and notice to other suites.
- Kitchen ventilation: many suites have no route to the exterior for a range hood, so recirculating hoods with charcoal filters are common. Replacing an existing ducted hood usually keeps the same duct.
- Electrical: ESA permits apply in condos just as in houses. Panels are small, so a new induction cooktop or added circuits need a load check.
- Sprinklers and fire alarm devices: sprinkler heads, smoke detectors and alarm speakers are part of the building's life safety systems. Moving them, or building a bulkhead around them, requires the building's fire protection contractor and a coordinated shut-down.
Moving or removing walls, or adding or moving plumbing fixtures, in a condo suite usually needs a building permit as well as board approval. Hamilton's building permit page and Kitchener's permit list explain when one is required, and our design and permits team prepares the drawings.
Condo renovation cost in Hamilton, Brampton and Kitchener
Condo work usually costs more per square foot than the same work in a house. Restricted hours, elevator bookings, hand-carrying materials and approval paperwork all add labour. These are typical 2026 ranges for Hamilton, Brampton and Kitchener-Waterloo, before HST.
| Project | Typical range | What moves the price |
|---|---|---|
| Condo kitchen | $22,000 to $55,000 | Cabinet quality, countertop material, appliance package, layout changes |
| Condo bathroom | $14,000 to $35,000 | Tub to shower conversion, tile, glass, moving drains |
| Full condo suite renovation | $90 to $275 per sq ft | Scope, finish level, walls moved, building restrictions |
| Approvals, deposits and building fees | A few hundred to several thousand dollars, much of it refundable | Building policy, engineering review, section 98 agreement |
A one-bedroom kitchen and bathroom refresh sits near the low end. A two-bedroom suite with new flooring throughout, a reworked kitchen and two bathrooms sits near the top. We give an exact price after visiting the suite and reading the building's renovation rules. For layout and budget ideas, see our kitchen renovation guide.
Commercial fit-out permits in Hamilton, Brampton, Kitchener and Cambridge
Most commercial interior work beyond paint, flooring and like-for-like fixtures needs a building permit. Adding or removing partitions, changing plumbing, HVAC or fire alarm and sprinkler systems, or changing the entrance all count. A change of use, such as turning a store into a restaurant or clinic, needs a permit even if very little is built, and it triggers a zoning review.
Commercial permit drawings are prepared by a qualified designer. Depending on the building's size and use, the Ontario Building Code may require an architect or engineer to design and review the work. Kitchener's ICI building permits page shows what a complete interior alteration application includes: a stamped building code matrix (a Part 11 matrix for a change of use), a commitment to general review from the architect or engineer, the BCIN designer's schedule 1, a key plan showing where the unit sits in the plaza or building, and stamped architectural, plumbing, HVAC and electrical plans.
Permit fees are charged by the area of work, and each city sets its own. In Kitchener, a non-residential interior alteration costs $0.37 per square foot plus a $1,000 rebate fee, both due at submission, so a 1,600 sq ft store pays about $590 in permit fees on top of that deposit. Brampton takes all commercial permit applications online, with separate packages for interior alterations and change of use, and Hamilton and Cambridge publish their own fee schedules and application checklists.
Other approvals often apply as well: an ESA permit for all electrical work, a separate sign permit for exterior signage, public health review for food premises, landlord approval of drawings, and in Brampton an occupancy permit before a new use opens. Extensive renovations can also trigger barrier-free upgrades to entrances and washrooms under the Building Code.
How a commercial fit-out works with your landlord and schedule
- Review the lease. The work letter or schedule in your lease says what the landlord provides (base building), what you build (leasehold improvements), any tenant improvement allowance, and whether you must restore the space when you leave.
- Survey and design. We measure the space, check existing services, sprinklers and HVAC, and develop a layout and finish plan with you.
- Drawings and approvals. Permit drawings go to the landlord first, then to the city with the permit application.
- Pricing and schedule. You get a fixed scope, a schedule built around your opening date, and long-lead items flagged early.
- Construction. In occupied malls and plazas, noisy work often happens after hours. Our crews follow the landlord's contractor rules and insurance requirements.
- Inspections and handover. City and ESA final inspections, deficiency walkthrough, and the documents you need for your insurer and landlord.
A simple office or retail refresh can take 3 to 6 weeks of construction. A full fit-out with permits usually takes 2 to 4 months from design to opening, and restaurants take longer because of kitchen exhaust, grease interceptors and gas work.
One of our projects is a jewellery store fit-out. A store like that shows why planning matters: display millwork, case and accent lighting, security wiring and the alarm installer all have to be coordinated so the cases, lighting and sensors line up on opening day.
Commercial renovation costs per square foot
Commercial fit-out costs vary more than residential work because the starting condition varies so much. A space delivered as a bare shell needs everything, while a second-generation space with usable ceilings, washrooms and HVAC may need only partitions and finishes.
| Space type | Typical range (Hamilton, Brampton, Kitchener-Waterloo, 2026) | Main cost drivers |
|---|---|---|
| Retail store | $55 to $140+ per sq ft | Millwork, lighting, storefront, flooring |
| Office | $85 to $190+ per sq ft | Number of offices and meeting rooms, ceilings, HVAC changes, data cabling |
| Restaurant or café | $140 to $325+ per sq ft | Kitchen exhaust and make-up air, plumbing, gas, electrical capacity |
These exclude furniture, equipment, IT and design fees unless noted in the quote. Any tenant allowance from your landlord reduces your share. We price each job after visiting the space and reviewing the lease work letter.
Small repairs, emergency repairs and maintenance
Small jobs are a good way to start working together. Typical requests include drywall and ceiling patches after a leak, sticking doors, damaged trim, replacing a vanity or faucet, fixing a loose railing, and preparing a rental unit between tenants.
After a leak or storm
- Stop the source if you can: close the main water valve or the fixture shut-off, and switch off power to wet areas at the panel only if it is safe to reach.
- Take photos and video before anything is moved or removed.
- Call your insurer, and in a condo, the property manager, because the water may come from a common element or another unit.
- Remove standing water and wet materials quickly. Drywall, insulation and carpet that stay wet for more than a day or two can grow mould.
We then open up and dry the affected area, document it for the adjuster, and rebuild. For roof or siding damage after a storm, our exterior team handles temporary protection and permanent repair. For electrical or plumbing failures, or a basement that floods from the sewer, see our plumbing, electrical and HVAC service, which covers backwater valves and Hamilton's flood protection grants.
Choosing a contractor for condo or commercial work
Condo boards and landlords check contractors before they let them in, so you should too. Ask these questions before you sign:
- Can you provide a liability insurance certificate naming the condo corporation or landlord, and a WSIB clearance? WSIB's clearance FAQs explain how to confirm one.
- Have you read the building's renovation rules, and does the schedule fit the allowed work hours?
- Who prepares the drawings and permit application, and who deals with the property manager?
- Who is the licensed electrical contractor? ESA explains how to check on its hire a licensed contractor page.
- What workmanship warranty do you give, and what does it cover? Ours is 2 years.
- How will you protect common areas, and how is debris removed?
We have worked on homes and businesses in the area since 2020, and many condo projects grow into a larger suite overhaul, which our interior renovation crews also handle. Browse more answers on our FAQ page, or send the building's renovation package and your plans through our free quote form.
Condo, commercial and repairs: common questions
Do I need my condo board’s approval to renovate?
Often, yes, especially for flooring, plumbing or anything that affects the building's structure or soundproofing. We help prepare the paperwork your property manager asks for.
Do you take on small jobs?
Yes. Small repairs often lead to long relationships. Send us a description and a few photos and we will let you know if it is a fit.
What is a section 98 agreement?
It is a written agreement between a condo owner and the corporation, required under section 98 of the Condominium Act, 1998, before an owner alters a common element. It sets out who pays for and maintains the change and is registered on title to the unit.
Do I need a building permit for a condo renovation?
Cosmetic work such as new cabinets, counters, flooring and paint usually does not. Moving or removing walls or adding or moving plumbing usually does, in addition to board approval.
Can I move my condo kitchen or bathroom?
Sometimes. Drains run through the slab or into shared stacks, so major moves may need slab coring, an engineer's scan and board approval. We check the drain locations before you commit to a new layout.
Can I install hardwood floors in my condo?
Usually, if you use an acoustic underlay that meets your building's minimum sound rating. Most boards ask to see the product data before approving flooring.
Does a commercial fit-out need a building permit?
Usually. New partitions, plumbing, HVAC, fire alarm or sprinkler changes, and any change of use need a permit. Painting, flooring and like-for-like fixture replacements usually do not.
How much is a commercial building permit in Kitchener?
For a non-residential interior alteration, Kitchener charges $0.37 per square foot plus a $1,000 rebate fee, both paid at submission. Hamilton, Brampton and Cambridge set their own fees, so we confirm them when we prepare your application.
How long does a commercial fit-out take?
A small office or retail refresh can take 3 to 6 weeks of construction. A full fit-out with permits typically takes 2 to 4 months from design to opening, and restaurants take longer.
Can you work after hours in my store or office?
Yes, when the landlord and the schedule call for it. Noisy work in occupied plazas and malls is often scheduled after closing so your neighbours, or your own business, can keep running.